fusion_costing_code
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
fusion_costing_code [2019/09/07 13:34] – simonw7 | fusion_costing_code [2022/07/21 06:59] (current) – external edit 127.0.0.1 | ||
---|---|---|---|
Line 1: | Line 1: | ||
+ | {{: | ||
+ | |||
+ | During the last 10 years, WSI has developed a costing model in collaboration with Decysive Systems and most recently with Bechtel for the costing of most of the major fusion subsystems. We have worked under contract with ARPA-E to produce the cost analysis for 4 of the ALPHA program fusion concepts. | ||
+ | |||
+ | [[ https:// | ||
+ | |||
+ | [[ https:// | ||
+ | |||
+ | [[ http:// | ||
+ | |||
+ | [[ https:// | ||
+ | |||
+ | [[ http:// | ||
+ | |||
+ | Costing references can be found [[ https:// | ||